Projects
Projects let you manage several duties (pieces of equipment) and the selections for each duty by project: a project contains a number of duties, and each duty has one primary selection and any number of alternative selections. You can compare them in a summary, print, export to Excel and eQuote, and also import workspace and project files. Entry point: “Projects” in the left Workspace.
Project list
About the list
The page title is “Projects” and the subtitle is “Organise duties and pump selections by project, compare them in a summary, and export to Excel or eQuote.” The list is sorted by update time, newest first; when there are no projects it shows “No projects yet. Create one, or import a project file.” Double-click a row to open the project.
Project name (column)
The name in blue with a folder icon; click it to open the project page.
Company (column)
The company entered in the project details.
Created by (column)
Shown when team sharing is active: the member who created the project; your own projects are shown in blue.
Duties (column)
The number of duties in the project.
Selections (column)
The total number of selections across all duties of the project.
Revision (column)
Increases by 1 each time the project is changed (any addition, deletion, change or reordering of project details, duties or selections).
Updated (column)
Time of the last change.
List actions
Button · Function
Open · Opens the project page
Rename · Changes the project name; same rules as for a new project
Delete · Deletes after you confirm “Delete project "Name"? All its duties and N selection(s) will be deleted permanently.”, and shows “Deleted”; if the deletion fails, the reason is shown and the list is refreshed
··· (Copy to mine) · Shown only for teammates' projects: click “···” at the end of the row and choose “Copy to mine”; copies the whole project (with all duties and selections) to your account and opens the copy automatically
For projects you have no permission to change, “Rename” and “Delete” are grayed out.
Mine / Whole team (projects)
Shown when team sharing is active; switches between showing only your own projects and including teammates' projects.
Search by name (projects)
Filters instantly, matching project name, company and creator.
New project
Creation steps
Click “New project”, enter the “Project name” in the dialog and click “OK”; the new project opens automatically. The default name is “New Project”; if it already exists, it is numbered automatically as “New Project 2”, “New Project 3”…
Project name rules
Required; leading and trailing spaces are removed. If it is empty, the message “Please enter a project name” appears.
At most 128 characters; a longer name gives “Name is too long”.
It must not duplicate the name of another of your own projects, otherwise “A project with this name already exists” appears (teammates' projects do not count).
Project limit
Each account can have at most 200 projects (only those you created count); when the limit is reached, the message “You have reached the limit of 200 projects” appears.
Import project file
Import dialog
Click “Import project file”; the dialog explains: “Choose a workspace (.wrk) or project (.sprj) file. Projects, duties, selections and saved searches are imported; open each imported selection once in Filter Search to complete its results.”
1. Drag the file into the dashed box, or click to choose a file. Only 1 file can be chosen, in .wrk or .sprj format, no larger than 5 MB.
2. Click “Import”. The button is grayed out while no file is chosen.
Import results
On success, “Imported N project(s), N duty(ies), N selection(s) and N saved selection(s)” is shown.
If some entries cannot be imported, “N item(s) skipped:” is appended, followed by the first 5 reasons (for example, a selection without a curve).
The import result (including skipped items) stays in the dialog so you can check it first. If only 1 project was imported, an “Open project” button is shown at the bottom of the dialog; click it to go to that project, or click “Close” to stay in the project list.
If an imported project has the same name as an existing one, it is renamed automatically to “Name (2)” etc.
Imported selections and saved selections are all shown as “Needs recalculation”; the saved selections also carry the “Imported” tag.
Import limits
The total number of projects after import must not exceed 200, and the total number of saved selections must not exceed 500; otherwise nothing in the file is imported and the corresponding limit message is shown.
Only the first 100 duties of each project and the first 50 selections of each duty are imported.
Import error messages
Message · Meaning and action
Please choose a file · No file has been chosen
This file isn't recognised. Please choose a .wrk or .sprj file. · The file format is wrong or the file is damaged
The file is too large (limit 5 MB) · The file is larger than 5 MB; split it and import the parts
The file contains no projects or selections to import · The file is empty
You have reached the limit of 200 projects / You have reached the limit of 500 saved selections · Delete projects or saved selections you no longer need first
Project page
Page layout
Top: the path “Projects / Project name”, the revision number and update time; for a teammate's project “· Created by Name” is shown; without permission to change it a “Read only” tag is shown. On the right are the “Add duty”, “Summary” and “Export to eQuote” buttons. In an active enterprise team there is also a “Create quotation” button, which generates quote lines from the primary option of each duty; see Quotations.
Left tree: project → duties (with number and tag number) → selections. The primary selection has a star icon and is shown in blue, alternative selections have a hollow circle, and selections that need recalculation have a “Needs recalculation” tag; a duty without selections shows “(no selections)”; when the project has no duties yet it shows “No duties yet. Click "Add duty" above.”
Right: shows the project details, the duty or the selection depending on the node selected on the left; click “Summary” to switch to the summary table.
Read only badge
When a team member has no permission to change the project, or the team has expired (grace period), the project page shows a “Read only” tag; all input boxes and change buttons are grayed out, and you can only view, open selections, create reports, view the summary and export.
If the project has been deleted or you no longer have permission to view it, the page shows “Not found — it may have been deleted” and a “Back to projects” button.
Project details
Click the project name in the left tree to show the “Project details” form; after making changes click “Save”, and the message “Saved” appears.
Project name (Project details)
Required; same rules as for a new project.
Company
The customer's company name, at most 128 characters.
Author
The person who prepared the project, at most 128 characters.
Contact
The customer's contact person, at most 128 characters.
Email (Project details)
The contact's email address, at most 128 characters; the format is not validated.
Phone
At most 128 characters.
Mobile
At most 128 characters.
Address
At most 512 characters.
eQuote reference
The corresponding number in the quotation system, at most 128 characters.
Notes (Project details)
At most 8000 characters.
Revision and date
Read only: shows the revision number and the “Created” and “Updated” times.
Duties
A duty represents the selection requirement for one piece of equipment (one tag number) in the project; it can hold several selections.
Add duty
Click “Add duty” at the top, enter the “Equipment name” and click “OK”; the new duty is added at the end and selected automatically. If the equipment name is empty, the message “Please enter an equipment name” appears.
Duty limit
Each project can have at most 100 duties; when the limit is reached, the message “A project can have at most 100 duties” appears.
Equipment name
Required, at most 128 characters; shown in the tree and in the column headers of the summary table.
Default tag number
The duty's tag number (equipment number), at most 64 characters, shown after the equipment name in the tree. It is used for selections that have no tag number of their own.
Pump type
Horizontal, Vertical or Submersible, used for reports and eQuote.
Pump application
Not listed, Severe duty, Heavy duty, Medium duty, Light duty, Froth, Milling, Dredging, Chemical; can be cleared. Used only in the summary table and reports; not used in calculations.
Save (duty)
Saves the changes above; the message “Saved” appears. If the equipment name is empty, the message “Please enter an equipment name” appears.
Move up and Move down
When you move the mouse over a duty in the tree, up and down arrows appear on the right; click them to change the order of the duties. The numbers are updated accordingly, which also changes the column order of the summary table.
Delete duty
Click “Delete duty” in the duty form; it is deleted after you confirm “Delete duty "Name" and its N selection(s)?”, and this cannot be undone.
Selections
A selection is a candidate pump selection for a duty. Each duty has exactly one primary selection; the rest are alternative selections.
Adding a selection
Selections can only be added from selection results:
Route · Action · After adding
Filter Search · In the duty form click “Add a selection via Filter Search” to open Filter Search (it automatically carries this project and this duty); after completing the selection, click “Add to project” in step 6; the dialog already has this project and this duty selected · With complete calculation results
Saved Selections · Click “Add to project” in the “⋯” menu of the saved selection list · Copies the saved selection; the results are the same as the original entry
Data Search · Right-click a result row and choose “Add to project” · Water duty only; shown as “Needs recalculation”
The duty form also shows the hint: “Finish a selection in Filter Search, then click "Add to project" in step 6 and choose this duty.”
In the add dialog you can create a new project and a new duty, and choose “Primary selection” or “Alternative selection” and the tag number; see Data Search. The dialog remembers the project and duty you last added to, and selects them by default the next time it opens; the success message contains an “Open project” link, and clicking it goes straight to that project. Each duty can have at most 50 selections; when the limit is reached, the message “A duty can have at most 50 selections” appears.
Primary and Alternative
The primary selection is always listed first in the duty and has a star icon in the tree.
The first selection added to an empty duty automatically becomes primary.
When you mark a selection as primary, the previous primary selection automatically becomes an alternative.
When the primary selection is deleted, the next selection is automatically promoted to primary.
Selection details
Click a selection in the tree; the right side shows the selection name with a “Primary” or “Alternative” tag, and:
Item · Content
Pump (model / size / curve) · The selected curve
Duty (flow · head) · Design flow and head at the time of saving
Speed · efficiency · Predicted speed and efficiency at the time of saving; shows “Needs recalculation” when recalculation is needed
Tag number · The selection's tag number; “-” when not set
Duty · The equipment name of the duty it belongs to
Open in Filter Search (selection)
Restores all 6 steps of the selection in Filter Search; see Saved Selections. After making changes, click “Save back to "Selection name"” in step 6 to overwrite the selection.
Curve, Simulate and Report (selection)
Curve: opens the curve in a new window with the saved duty marked.
Simulate: opens Duty Simulation with the saved duty (requires Premium membership).
Report: opens the selection report; grayed out when recalculation is needed.
Data Sheet: generates a Data Sheet or Technical Agreement (Word), see Saved Selections; grayed out when recalculation is needed.
Mark as primary
Shown for alternative selections; click it to make the selection primary.
Change tag number
Changes the selection's own tag number; when cleared, the duty's default tag number is used.
Move up and Move down (selection)
Changes the order of the alternative selections within the same duty. The primary selection is fixed in first place and its buttons are grayed out; alternative selections cannot be moved in front of the primary.
Selection action failed
If “Mark as primary”, “Change tag number”, “Move up”, “Move down”, “Move to duty” or dragging a selection fails, the reason is shown and the tree is refreshed: for example “Not found — it may have been deleted” (the project or selection was deleted elsewhere), “You don't have team permission for this. Please contact the team owner”, or “The team has expired; shared data is read-only”.
Move to duty
Shown when the project has several duties: choose the target duty from the drop-down list to move the selection there. You can also drag a selection onto another duty in the left tree. After the move, the selection becomes an alternative of the target duty (or the primary if the target duty had no selections); if the original duty loses its primary selection, the next selection is automatically promoted to primary.
Delete (selection)
Deletes after you confirm “Delete selection "Name"?”.
Needs recalculation
What needing recalculation means
Selections imported from a file and selections added from Data Search have only the duty parameters and no complete web calculation results; they are shown as “Needs recalculation” in the tree and in Saved Selections. When selected, the hint reads: “This selection came from a file import or Data Search and has no complete results yet. Open it in Filter Search, then click "Save back to…" to complete it.”
Effects of needing recalculation
The selection's “Report” button is grayed out.
The summary table shows only its duty parameters, with the notice “Some selections need recalculation; only their duty parameters are shown.”
It cannot be exported to eQuote.
Completing the results
1. Select the selection and click “Open in Filter Search”.
2. Filter Search automatically searches with the saved duty and selects the original curve; if you are told the original curve is not in the results, choose again in step 4.
3. Check the step 5 configuration, go to step 6 and click “Save back to "Selection name"”.
4. Back in the project, the selection's “Needs recalculation” tag has disappeared.
Summary
Click the “Summary” button at the top to switch to the summary (click again to return to the details). Description: “One column per selection; values are the results saved with each selection”. When the project has no selections, it shows “This project has no selections yet”.
Column headers
One column per selection, in duty order. The upper line of the column header is “No. Equipment name” and the lower line is the selection name; the primary selection is prefixed with “★” and shown in blue.
Rows
The item names and units are on the left. Rows that are empty for all selections are hidden automatically, as are section headings with no data below them.
Section · Rows
Service description · Equipment, Tag number, Selection (Primary/Alternative), Quantity, Arrangement, Pump application
Duty · Slurry flow, Slurry head, Flow range, Head range, NPSHa, Temperature, Altitude
Slurry · Slurry type, Solids SG (S), Slurry SG (Sm), Cw, Cv, d50, Settling velocity
Service factors · HR/ER method, Hr, Er, Motor safety factor, Pump speed, Pump efficiency, BEP efficiency, Absorbed power (slurry)
Pump selection · Model, Size, Curve number, Pump type, Impeller, Impeller material, Liner material, Seal, Frame, Bearing assembly, Shaft material
Drive · Drive, Motor power, Motor speed, Differential impeller
Pressure limits · Casing pressure
Bearing life & stress · Frame / bearing assembly, Wet-end life, Drive-end life, Stress DE / WE / thread (only for the selected frame; pass ✓, fail ✗)
Allowable flange loads · Intake axial load Fz, Intake force Fxy, Intake torsional moment Mz, Intake bending moment Mxy, Discharge axial load Fy, Discharge force Fxz, Discharge bending moment Mxz, Discharge torsional moment My
Check results · One row per check item, showing the result at the nominal duty ✓ / ✗ / ⚠
Cells containing ✗ are red, and cells containing ⚠ are orange.
Print / save as PDF
Opens the browser's print dialog to print the current page. When printing, the button bar above the summary table is hidden, the title “Project name · Summary” is added before the table, and all rows of the table are expanded in full with a smaller font size. To save an electronic copy, choose “Save as PDF” as the destination; with many columns, landscape paper is recommended. If you need a file containing only the table, “Export to Excel” is the better choice.
Export to Excel
Exports the summary table as “Project name.xlsx”, with the same content as the summary table on screen. The button is grayed out when the project has no selections.
Export to eQuote
Export
Click “Export to eQuote” at the top to download “Quote_Project name.xml”, which can be imported into the eQuote quotation system. Values are always output in L/s, m, °C, µm, mm, kW and m/s.
Required fields
Every selection must have the following data, otherwise the project cannot be exported:
Required field · Meaning · Usual source
PumpModel, PumpSize · Pump model, size · Selected curve
PumpOrientation · Alignment · Selected curve
Bearing · Frame model · Frame selected in Filter Search step 5
SGSolids · Solids SG S · Step 1
SGSlurry · Slurry SG Sm · Step 1
D50 · Median particle size · Particle size in step 1
SlurryTemp · Slurry temperature · Temperature in step 1
Flow, Head · Flow, head · Steps 1 and 2
RPM · Speed · Calculation result
ImpellerDiameter · Impeller diameter · Impeller selected in step 5
SuctionDiameter · Suction diameter · Selected pump
TipSpeed · Tip speed · Calculated from impeller diameter and speed
SelectionName · Selection name · Selection
Quantity · Quantity · Always 1
Export error messages
Message · Meaning and action
The project has no selections to export · Add selections first
N selection(s) need recalculation (names…). Open them in Filter Search and save them before exporting. · Follow Completing the results, then export
Export failed — required values are missing: · The missing items are listed below, one per line (at most 8 lines), in the format “Duty 'Equipment name - Selection 'Selection name' - 'Required field name'…”. Open that selection in Filter Search and complete it (e.g. select the impeller and frame, enter the particle size and temperature), save it back, then export again
Tip: Private curves have no impeller, frame or diameter data, so a selection that uses a private curve usually cannot be exported to eQuote.
Copy to mine
Copying a teammate's project
In the project list, teammates' projects have a “···” button at the end of the row; click it and choose “Copy to mine”. The copy includes the project details and all duties and selections (with calculation results and recalculation status), and belongs to you; if the name already exists, a number is added automatically. On success the message “Copied to your account” appears and the copy opens.
Requires the “Projects & selections” permission set to “Edit own”.
Subject to your own limit of 200 projects.
Before leaving a team, you can use it to keep the projects you need.
Team sharing rules
Who can view and who can edit
During the team's validity period and the read-only grace period, all members can view teammates' projects, open selections, create reports and export.
Changing your own projects requires the “Projects & selections” permission set to “Edit own”; changing or deleting teammates' projects requires “Manage all”.
During the grace period, teammates' projects are read-only, with the message “The team has expired; shared data is read-only”.
Content added to a teammate's project
Duties and selections you add to a teammate's project belong to the creator of that project (they count towards that person's data) and are not split off to your account. Selections can only be moved between duties of the same project.
Limits count per person
The limits of 200 projects and 500 saved selections count only the ones you created yourself; the limits of 100 duties per project and 50 selections per duty apply per project.
Other tips
Message · Meaning
You don't have team permission for this. Please contact the team owner · You lack the corresponding team permission
The team has expired; shared data is read-only · The team is in its grace period
Not found — it may have been deleted · The project, duty or selection has been deleted, or you are no longer in that team
The data is too large to save · The data of a single selection exceeds the storage limit
Something went wrong. Please try again. · Other reasons
See Team Edition.