Filter Selection

Six steps from slurry duty to a verified pump

What it does

Six steps take a slurry pump selection from flow, head and preferences through curve selection and configuration to project options. Slurry properties and HR/ER derating update as you type, 15 engineering checks run automatically, and bearing L10 life and shaft stress are calculated.

  • Enter the known values of S, Sw, Sm, Cw and Cv and the rest are solved, along with settling velocity and solids mass flow
  • 8 HR/ER methods: WB Standard, WB Pump/Slurry Based, ANSI/HI 12.1–12.6, froth, non-Newtonian, coal industry and user-defined
  • Multi-section system head from pipe diameter, length, fitting K values and static head, with NPSHa calculated automatically
  • 15 checks including tip speed, casing pressure, seal pressure, critical speed and motor power
  • Cascading impeller, material, frame, bearing and seal configuration, plus a centrifugal (expeller) seal pressure check

Related features

Loading... If the page does not appear, please make sure JavaScript is enabled in your browser.